Quantcast
Channel: RFPMart - Arkansas RFPs
Viewing all articles
Browse latest Browse all 3133

US-FED-00000211720 - FY24 Fiber to Bldgs 714, 718 & 846 - Deadline July 12,2024

$
0
0
Fiber connectivity is required to provide 19 CES dorm managers the capability to access the AFNET from the specificdorm, which they have been assigned to manage. Also, fiber connectivity provisions the Energy Management ControlSystems (EMCS) the means to remotely control/monitor consumption of heating, ventilation and air conditioning (HVAC), lighting, and water heating systems of the facilities.The Statement of Objectives (SOO) defines the requirements for the Contractor to engineer, furnish, install and test (EFI&T) new maintenance hole/duct–bank infrastructure and single mode fiber optic cable (FOC) to connect Dorms 714, 718 and 846 to existing base fiber optic infrastructure (ITB 988) at Little Rock AFB, AR.The contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the r

Viewing all articles
Browse latest Browse all 3133

Trending Articles