(1) Vendor needs to provide command post security system update to the government authority located in Arkansas. – The contractor shall develop a thorough plan to adequately and properly remove/replace any old and outdated and unnecessary door access control systems and building security cameras and controls– All devices, peripherals, materials and equipment with wireless capabilities/functionality will be removed or disabled, with prominent labelling indicating accomplishment of that requirement prior to installation.– The contractor shall provide battery back–up to all workstations, devices, peripherals, and/or equipment to ensure zero or minimal interruption in power and to ensure zero damage due to power surges and lightning strikes.
↧