The contractor shall perform 38 tree and stump removals (See attached maps and table in Appendixes A & B for locations and sod areas): All 37 trees and stumps shall be removed with debris carried away to locations set by the COR. Stumps ground 4 inches below grade, filled with topsoil and Bermuda sod over areas
↧