The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work inaccordance with these specifications. The general requirement for the project is to remove and dispose of all vinylcomposition tile (VCT), ceramic tile, and floor base in the selected areas of Building 118, Little Rock AFB, andreplace with new luxury vinyl planks (LVP), new transition strips, and new resilient floor base All flooring materialwill be contractor furnished. This general outline ofwork does not, in any way, limit the responsibility oftheContractor to perform all work as specified herein. The new LVP is a brand name requirement. Brand Name Justification is attached.––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––NOTE:
↧