(1) Vendor needs to provide stormwater manhole frames and covers services to the government authority located in Hot Springs, AR. – Castings shall be manufactured true to pattern; component parts shall fit together in a satisfactory manner.– They shall be of uniform quality, free from sand holes, shrinkage, cracks, or other defects They shall be smooth well cleaned by shot–blasting and furnished without paint.– All circular manhole frames and covers shall be furnished with machined horizontal bearing surfaces.– The manufacturer’s shop drawing shall be submitted to the City Engineer for approval prior to the manufacture or shipment of castings.– The City Engineer retains the right to reject castings not conforming to this specification.– Manhole covers shall be furnished with markings as indicated in the attached sample shop drawing.(2) All questions must be submitted no later than August 09, 2024 (3) The contract period will be for one year.
↧